Monday, October 27 |
||||
|
|
||||
|
|
||||
|
9:00am |
Speaker: Scot McClintock, Faithful+Gould |
|
||
|
|
|
|||
|
|
Coffee and Networking Break |
|
||
|
|
|
|||
|
|
Introduction to VE Continued |
|||
|
10:15am |
Speaker: Scot McClintock, Faithful+Gould |
|
||
|
|
|
|||
|
11:45am - 1:30pm |
Opening Luncheon |
|
||
|
|
|
|||
|
|
Getting it Right |
Creating Value in Sustainability |
|
|
|
|
|
|||
|
1:30pm - 2:15pm |
Developing a VE Program in |
Value
for Money Analysis for Surface Transportation Infrastructure |
Laboratory
achieves gold sustainability certification through VE |
|
|
|
|
|||
|
2:15pm - 3:00pm |
Developing
a VE Program in Industry |
Cost Risk Analysis
and Value Engineering |
Green Sustainable
Design Using Function Analysis: A Case Study |
|
|
|
|
|||
|
|
Coffee and Networking Break |
|
||
![]()
|
|
|
|||
|
|
Getting it Right |
Choosing the Right Project |
Creating Value in Sustainablity |
|
|
|
|
|||
|
3:15pm - 3:45pm |
Acquiring VE
Services |
Some Observations on
Transportation Agencies’ Development of Project Risk Management Programs |
Integrating
Sustainability into the VE Job Plan |
|
|
|
|
|||
|
3:45pm - 4:15pm |
Right Sizing
VE Studies |
Creating Sustainable Value with Value
and Risk Management |
Innovative Worldwide VE Case Studies
& How Cultural Values Impact Creativity |
|
|
|
|
|||
|
4:15pm - 4:45pm |
VE, What's in It For
the Owner? |
Creating and Sustaining Value - Panel |
Creating Value
in Sustainability - Panel |
|
|
|
|
|||
|
4:45pm - 6:00pm |
Exhibitor Showcase |
|
||
|
|
|
|||
|
6:00pm |
Dinner, Keynote Speakers
and CSVA Awards |
|
||
|
|
|
|||
|
|
|
|||
Tuesday, October 28 |
|||
|
|
|||
|
8:00am - 8:30am |
Opening Remarks |
||
|
|
|||
|
8:30am - 9:00am |
Keynote Speaker |
||
|
|
|||
|
|
Higher Education |
Design Build and VE |
|
|
|
|||
|
9:00am - 9:30am |
The VE
Workshop at |
Value Engineering in Design Build: Constructability
Applications |
West Transitway Tunnel VE Study |
|
|
|||
|
9:30am - 10:00am |
Panel
Discussion: VE in Higher Education |
Design Build and
VE - Experiences in Surface Transportation |
|
|
|
|||
|
10:00am - 10:15am |
Coffee and Networking Break |
||
|
|
|||
|
|
Alternative Delivery & Risk (P3) |
Creating Value in Surface Transportation |
|
![]()
|
|
|||
|
10:15am - 10:45am |
VM - The Link for Modern
Management Improvement Tools |
Obtaining Value for Money on the
Royal |
|
|
|
|||
|
10:45am - 11:15am |
Manufacturing the right product Vs.
manufacturing the product right |
Obtaining Value for Money on the
Royal |
The Turcotte / Hwy 20 Interchange |
|
|
|||
|
11:15am - 11:45am |
Developing a Competitive Edge Through
Lean Project Engineering at P&WC |
Value For Money in
Alternative Finance Procurement |
VE of Highway 7
New, Kitchener to |
|
|
|||
|
11:45am - 12:15pm |
Creating Value in Product Development - Panel |
Allocating and Valuing Risk - Panel |
Using
FPS to Define |
|
|
|||
|
12:15pm - 1:15pm |
Lunch
and Networking Break |
||
![]()
|
|
|||
|
|
Risk Based Assessment for Infrastructure |
Water and Wastewater |
|
|
|
|||
|
1:15pm - 1:45pm |
Cost Reduction Methodologies for Electronic
Products |
Developing
a Risk Analysis Program for Waterfront |
Value
Engineering in |
|
|
|||
|
1:45pm - 2:15pm |
New
Product Introduction for Electronic Components with VA |
|
The
Winning Strategies for Odour Reduction (Humber Treatment Plant Odour Control
) and Management of Wet Weather Flows at the City of Toronto Ashbridges Bay Treatment Plant |
|
|
|||
|
2:15pm - 2:45pm |
Saving
the Life of a New Product with Function Analysis and Failure Mode and Effect
Analysis (FMEA) |
Risk
Based Estimating for |
Town
of |
|
|
|||
|
2:45pm - 3:15pm |
Function Modeling of Systems: The DfV Approach to Business
Innovation |
Evaluating
the Cost of Risk under Different Procurement Methods |
More Value
In Water, Wastewater - Panel Cont'd |
![]()
|
|
|||
|
3:15pm - 3:30pm |
Coffee and Networking Break |
||
|
|
|||
|
|
Estimating and Managing Escalation |
Unconventional Uses of VE |
|
|
|
|||
|
3:30pm - 4:00pm |
Using
VA to Program Investments in School Facilities |
Strategies to Model & Manage Cost Escalation |
VE-FPS
Guides Strategy for Winter Highway Closure in |
|
|
|||
|
4:00pm - 4:30pm |
Finding Value Through Function Cost
Techniques |
Cost Escalation Panel |
Benefits of
FPS on IT Projects from a Business Perspective |
|
|
|||
|
4:30pm - 5:00pm |
The Value of
Safety Analysis |
Cost
Escalation Panel Cont'd |
Target
Costing and VE |
|
|
|||
|
5:00pm |
Closing Remarks |
||
|
|
|||